Business » Minimum Sampling Guide »

Brick, Clay

General

How Received: Material Receipt
Metric / English: B
Facility Type:
Default Auth. Lab: Physical Lab
Project Certification: Non-Critical
MSG Responsibility: Physical Lab
Local Administered Project: N

Methods of Acceptance

Pretest: N/A
Sample/Test: REQ
Approved List: N/A
Visual Inspection: REQ
Catalog Cut: N/A
Certification: REQ
Small Quantity: N
Small Quantity Comment:
Other Reports: Prepayment Invoice Required

Certification

M&T 913 Report (Steel): N
Certification Types: 3: Manufacturer's Certification

Frequency / Additional Info

Sample Frequency
Comment:
REQ
 
Test CategorySample FrequencySampling ResponsibilityTesting Responsibility
Acceptance100000.000M&T FieldM&T Lab
One Sample Per [Sample Frequency] UOM

Local Administered Project Exceptions

LAP Exception Description: N/A