Business »
Minimum Sampling Guide »
Pipe, Outlets and Drains, PE
General |
How Received: |
Material Receipt |
Metric / English: |
E |
Facility Type: |
Plastic Pipe |
Default Auth. Lab: |
Physical Lab |
Project Certification: |
Critical |
MSG Responsibility: |
Field Section |
Local Administered Project: |
N |
Methods of Acceptance |
Pretest: |
REQ |
Sample/Test: |
N/A |
Approved List: |
OPT |
Visual Inspection: |
REQ |
Catalog Cut: |
N/A |
Certification: |
REQ |
Small Quantity: |
N |
Small Quantity Comment: |
|
Other Reports: |
QC Sticker, QC/QA Program |
Certification |
M&T 913 Report (Steel): |
N |
Certification Types: |
3: Manufacturer's Certification
|
Frequency / Additional Info |
Sample Frequency Comment: |
N/A |
|
Test Category | Sample Frequency | Sampling Responsibility | Testing Responsibility |
Quality Control | 40000.000 | Producer/Supplier | Producer/Supplier |
Quality Assurance | 80000.000 | M&T Field | M&T Lab |
|
One Sample Per [Sample Frequency] UOM
|
Local Administered Project Exceptions |
LAP Exception Description: |
N/A |