Business » Minimum Sampling Guide »

Asphalt Binder

General

How Received: Material Receipt
Metric / English: E
Facility Type: Asphalt Terminal
Default Auth. Lab: Asphalt Lab
Project Certification: Critical
MSG Responsibility: Asphalt Lab
Local Administered Project: N

Methods of Acceptance

Pretest: N/A
Sample/Test: OPT
Approved List: N/A
Visual Inspection: N/A
Catalog Cut: N/A
Certification: REQ
Small Quantity: N
Small Quantity Comment:
Other Reports: Other Cert. Req'd = Transporter's Bill of Lading

Certification

M&T 913 Report (Steel): N
Certification Types: 6: Supplier's Certification
Other

Frequency / Additional Info

Sample Frequency
Comment:
OPT
 
Test CategorySample FrequencySampling ResponsibilityTesting Responsibility
Quality Control500000.000Producer/SupplierProducer/Supplier
Verification20000.000M&T LabM&T Lab
One Sample Per [Sample Frequency] UOM

Local Administered Project Requirement

Local Administered Project Requirements: N/A