Business » Minimum Sampling Guide »

Rock Embankment (Cubic Yards)

Local Administered Project Exception Exists

General

How Received: Not Received
Metric / English: E
Facility Type:
Default Auth. Lab: Physical Lab
Project Certification: Critical
MSG Responsibility: Physical Lab
Local Administered Project: Y

Methods of Acceptance

Pretest: N/A
Sample/Test: N/A
Approved List: N/A
Visual Inspection: REQ
Catalog Cut: N/A
Certification: N/A
Small Quantity: N
Small Quantity Comment:
Other Reports: Prepayment Invoice Required

Certification

M&T 913 Report (Steel): N
Certification Types:

Frequency / Additional Info

Sample Frequency
Comment:
N/A
 

Local Administered Project Exceptions

LAP Exception Description: Sample required if Borrow is not from an approved source. Minimum of one embankment density and one subgrade density per project. Embankment should meet 90%, subgrade 92%.