Local Administered Project Exception Exists |
General |
How Received: |
Not Received |
Metric / English: |
E |
Facility Type: |
|
Default Auth. Lab: |
Physical Lab |
Project Certification: |
Critical |
MSG Responsibility: |
Physical Lab |
Local Administered Project: |
Y |
Methods of Acceptance |
Pretest: |
N/A |
Sample/Test: |
N/A |
Approved List: |
N/A |
Visual Inspection: |
REQ |
Catalog Cut: |
N/A |
Certification: |
N/A |
Small Quantity: |
N |
Small Quantity Comment: |
|
Other Reports: |
Prepayment Invoice Required |
Certification |
M&T 913 Report (Steel): |
N |
Certification Types: |
|
Frequency / Additional Info |
Sample Frequency Comment: |
N/A |
|
|
|
Local Administered Project Exceptions |
LAP Exception Description: |
Sample required if Borrow is not from an approved source. Minimum of one embankment density and one subgrade density per project. Embankment should meet 90%, subgrade 92%. |