Business »
Minimum Sampling Guide »
Borrow Material For Quality
Local Administered Project Exception Exists |
General |
| How Received: |
Not Received |
| Metric / English: |
E |
| Facility Type: |
|
| Default Auth. Lab: |
Central GeoMaterials Lab |
| Project Certification: |
Non-Critical |
| MSG Responsibility: |
Central GeoMaterials Lab |
| Local Administered Project: |
Y |
Methods of Acceptance |
| Pretest: |
N/A |
| Sample/Test: |
REQ |
| Approved List: |
N/A |
| Visual Inspection: |
N/A |
| Catalog Cut: |
N/A |
| Certification: |
N/A |
| Small Quantity: |
N |
| Small Quantity Comment: |
|
| Other Reports: |
Boring Log and Site plan; |
Certification |
| M&T 913 Report (Steel): |
N |
| Certification Types: |
|
Frequency / Additional Info |
Sample Frequency Comment: |
REQ |
| |
| Test Category | Sample Frequency | Sampling Responsibility | Testing Responsibility |
| Source Approval/Evaluation | 1.000 | Project Personnel | M&T Lab |
|
|
One Sample Per [Sample Frequency] UOM
|
Local Administered Project Exceptions |
| LAP Exception Description: |
Sample required if Borrow is not from an approved source. Minimum of one embankment density and one subgrade density per project. Embankment should meet 90%, subgrade 92%. |