Business » Minimum Sampling Guide »

Guiderail, Cable

Local Administered Project Exception Exists

General

How Received: Material Receipt
Metric / English: E
Facility Type: Guardrail
Default Auth. Lab: Physical Lab
Project Certification: Critical
MSG Responsibility: Field Section
Local Administered Project: Y

Methods of Acceptance

Pretest: OPT
Sample/Test: OPT
Approved List: N/A
Visual Inspection: N/A
Catalog Cut: N/A
Certification: REQ
Small Quantity: Y
Small Quantity Comment: If temporary less than 200 feet
Other Reports: Brand Certification Program - Must Come with Bill Of Lading; Prepayment Invoice Required

Certification

M&T 913 Report (Steel): N
Certification Types: 3: Manufacturer's Certification

Frequency / Additional Info

Sample Frequency
Comment:
OPT
 
Test CategorySample FrequencySampling ResponsibilityTesting Responsibility
Verification80000.000Project PersonnelM&T Lab
One Sample Per [Sample Frequency] UOM

Local Administered Project Exceptions

LAP Exception Description: When placement is not adjacent to vehicle traffic, must come from approved producer, verify Heat numbers, no FIR required.