Local Administered Project Exception Exists |
General |
How Received: |
Ticket |
Metric / English: |
E |
Facility Type: |
Coarse Aggregate |
Default Auth. Lab: |
Central GeoMaterials Lab |
Project Certification: |
Critical |
MSG Responsibility: |
Central GeoMaterials Lab |
Local Administered Project: |
Y |
Methods of Acceptance |
Pretest: |
N/A |
Sample/Test: |
REQ |
Approved List: |
N/A |
Visual Inspection: |
N/A |
Catalog Cut: |
N/A |
Certification: |
N/A |
Small Quantity: |
Y |
Small Quantity Comment: |
2500 Tons - If more than 2500 tons a minimum of 2 samples per project. |
Other Reports: |
M&T 500, 504, or 514N or 515N |
Certification |
M&T 913 Report (Steel): |
N |
Certification Types: |
|
Frequency / Additional Info |
Sample Frequency Comment: |
REQ |
|
Test Category | Sample Frequency | Sampling Responsibility | Testing Responsibility |
Acceptance | 2500.000 | Project Personnel | M&T Lab |
Density | 1000.000 | Project Personnel | Project Personnel |
Quality Control | 2000.000 | Producer/Supplier | Producer/Supplier |
Quality Assurance | 20000.000 | M&T Field | M&T Lab |
Verification | 10000.000 | M&T Field | M&T Lab |
|
One Sample Per [Sample Frequency] UOM
|
Local Administered Project Exceptions |
LAP Exception Description: |
When placement is on Greenway or Multi-Use Path density requirement is 92% for Nuclear or Conventional method |