Business » Minimum Sampling Guide »

Guardrail Anchor Unit

Local Administered Project Exception Exists

General

How Received: Material Receipt
Metric / English: B
Facility Type: Guardrail
Default Auth. Lab: Field Section
Project Certification: Critical
MSG Responsibility: Field Section
Local Administered Project: Y

Methods of Acceptance

Pretest: N/A
Sample/Test: N/A
Approved List: N/A
Visual Inspection: N/A
Catalog Cut: N/A
Certification: REQ
Small Quantity: N
Small Quantity Comment:
Other Reports: Brand Certification Program

Certification

M&T 913 Report (Steel): N
Certification Types:

Frequency / Additional Info

Sample Frequency
Comment:
N/A
 
Test CategorySample FrequencySampling ResponsibilityTesting Responsibility
Verification4.000M&T LabM&T Lab
One Sample Per [Sample Frequency] UOM

Local Administered Project Exceptions

LAP Exception Description: When placement is not adjacent to vehicle traffic, must come from approved producer, verify Heat numbers, no FIR required.