NCDOT Will Temporarily Close Lanes on I-85 in Charlotte Next Week Wednesday, March 05, 2014

Closures are part of I-85/I-485 turbine interchange project

 

CHARLOTTE – The N.C. Department of Transportation is continuing work on the I-85/I-485 interchange conversion in northeast Charlotte as crews prepare to relocate barrier walls and install sign structures associated with the state’s first turbine interchange.

 

Beginning at 9 p.m. Monday, March 10, the department is scheduling nightly lane closures on I-85 North and South:

 

  • March 10: Right lane on I-85 North at I-485 (Exit 48) from 9 p.m. to 6 a.m. Tuesday, March 11, to install sign structures and reset barrier walls;
  • March 11: Right three lanes on I-85 South between I-485 (Exit 48) and Mallard Creek Church Road (Exit 46) from 9 p.m. to 6 a.m. Wednesday, March 12, to install sign structures;
  • March 12: Left lane on I-85 North at I-485 (Exit 48) from 9 p.m. to 6 a.m. Thursday, March 13, to remove median barrier walls;
  • March 13-14: Traffic will be shifted on I-85 North between Mallard Creek Church Road and Bruton Smith Boulevard (Exit 49) from 9 p.m. to 6 a.m. Thursday and Friday nights.

 

NCDOT reminds motorists to watch signs for construction information, stay alert and obey the posted speed limit.

 

For real-time travel information at any time, call 511, visit www.ncdot.gov/travel or follow NCDOT on Twitter at www.ncdot.gov/travel/twitter. Another option is NCDOT Mobile, a phone-friendly version of the NCDOT website. To access it, type “m.ncdot.gov” into the browser of your smartphone. Then, bookmark it to save for future reference. NCDOT Mobile is compatible with the iPhone, Android and some newer Blackberry phones.

 

For more information, please contact the resident engineer at (704) 983-4171.

 

***NCDOT***

NCDOT News Releases
Search Term
Select a Category
Start Date
End Date