NCDOT will start enhancement project N.C. 24/27 in Charlotte next week Wednesday, September 11, 2013

Project at Cabarrus Road intersection will enhance safety

 

CHARLOTTE – The N.C. Department of Transportation will start work on an enhancement project on N.C. 24/27 (Albemarle Road) at Cabarrus Road in east Charlotte at 9 a.m. Monday, Sept. 16, weather permitting. The project will improve safety and mobility on N.C. 24/27, and is scheduled to be completed by November 8.

 

The project includes adding a left turn lane on N.C. 24/27 east of Cabarrus Road, and widening the outside lane on N.C. 24/27 West. This will allow motorists to make safer u-turns.  A traffic signal will also be placed on N.C. 24/27 West approaching Clear Creek Elementary School. Concrete islands will be built in both directions to separate turn lanes from through lanes.

 

Crews are permitted to close or narrow lanes on N.C. 24/27 or Cabarrus Road from 9 a.m. to 4 p.m. Monday through Friday. They can work at night or on weekends with department approval.

 

NCDOT reminds motorists to watch signs for construction information, stay alert and obey the posted speed limit.

 

For real-time travel information at any time, call 511, visit www.ncdot.gov/travel or follow NCDOT on Twitter at www.ncdot.gov/travel/twitter. Another option is NCDOT Mobile, a phone-friendly version of the NCDOT website. To access it, type “m.ncdot.gov” into the browser of your smartphone. Then, bookmark it to save for future reference. NCDOT Mobile is compatible with the iPhone, Android and some newer Blackberry phones.

 

For more information, please contact the resident engineer at (704) 845-1151.

 

***NCDOT***

NCDOT News Releases
Search Term
Select a Category
Start Date
End Date