Bridge Preservation Work to Close N.C. 211 in Southport Thursday, June 13, 2013

RALEIGH — Weather permitting, the N.C. Department of Transportation will close a section of N.C. 211 in Southport next Sunday for preservation work on the bridge over the Duke Energy Progress Discharge Canal. 

Crews will close N.C. 211 between N.C. 87 and Dosher Cutoff SE each night from 7 p.m. until 6 a.m. the following morning, beginning Sunday, June 24.  With favorable weather, the work is expected to be completed by Monday morning, July 1.

During the closures, motorists should use the following signed detour route:

  • N.C. 133 (Dosher Cutoff SE) to N.C. 87 (River Road) back to N.C. 211 (N. Howe Street).

During preservation, a new sealant, called an epoxy overlay, will be applied to the bridge deck. The epoxy overlay process involves a thorough cleaning of the bridge deck.  A liquid epoxy is then applied to the bridge deck to seal any cracks. Finally, stone is placed across the bridge deck to ensure excellent traction for vehicles. These enhancements will improve the ride quality for motorists, as well as help the 41-year-old bridge last longer by sealing and protecting the pavement from water damage.

NCDOT reminds motorists to use caution in the area, watch signs for construction information and allow plenty of time to reach their destinations safely.

For real-time travel information any time, call 511, visit www.ncdot.gov/travel or follow NCDOT on Twitter at www.ncdot.gov/travel/twitter. Another option is NCDOT Mobile, a phone-friendly version of the NCDOT website. To access it, type “m.ncdot.gov” into the browser of your smartphone. Then, bookmark it to save for future reference. NCDOT Mobile is compatible with the iPhone, Android and some newer Blackberry phones.

 

***NCDOT***

NCDOT News Releases
Search Term
Select a Category
Start Date
End Date