NCDOT will close I-85 North entrance ramp in Concord Monday night Friday, March 22, 2013

Closure is part of $125.2 million I-85 widening project

 

CHARLOTTE – The N.C. Department of Transportation will be closing the ramp from N.C. 73 to I-85 North in Concord at 9 p.m. Monday, March 25, weather permitting. The closure is part of the 6.8-mile I-85 widening project, improving I-85 from four to eight lanes from south of Bruton Smith Boulevard (Exit 49) to north of N.C. 73 (Exit 55).

 

Contractor Lane Construction has to close the ramp to safely install a pipe under the road. A posted detour will take motorists to I-85 South to George Liles Parkway (Exit 54), where they can turn left and cross the bridge to access I-85 North.

 

The work should be completed by 6 a.m. Tuesday, March 26.

 

NCDOT reminds motorists to watch signs for construction information, stay alert and obey the posted speed limit.

 

For real-time travel information at any time, call 511, visit www.ncdot.gov/travel or follow NCDOT on Twitter at www.ncdot.gov/travel/twitter. Another option is NCDOT Mobile, a phone-friendly version of the NCDOT website. To access it, type “m.ncdot.gov” into the browser of your smartphone. Then, bookmark it to save for future reference. NCDOT Mobile is compatible with the iPhone, Android and some newer Blackberry phones.

 

For more information, please contact the resident engineer at (704) 983-4171.

 

***NCDOT***

NCDOT News Releases
Search Term
Select a Category
Start Date
End Date