Lane Shift on N.C. 540 Next Week in Wake County Friday, June 15, 2012

RALEIGH — The existing right lane of N.C. 540 West as traffic exits onto N.C. 55 will be shifted to the inside shoulder beginning Tuesday, June 19 for one week as the contractor for the Western Wake Freeway repairs an existing section of pavement on N.C. 540. 

In addition, on Monday, June 18 from 9 p.m. until 6 a.m., two of three lanes on N.C. 540 West will be closed as crews place barrier rail for the traffic shift.

Once the repair work is complete traffic will be shifted back into its original alignment.

NCDOT reminds motorists to watch signs for construction information, stay alert and obey the posted speed limit.
For information about the Western Wake Freeway project -- a section of the Triangle Expressway, North Carolina's first modern toll road-- visit www.westernwakeinfo.com

For real-time travel information at any time, call 511, visit http://www.ncdot.gov/travel or follow NCDOT on Twitter. Another option is NCDOT Mobile, a phone-friendly version of the NCDOT website. To access it, type "m.ncdot.gov" into the browser of your smartphone. Then, bookmark it for future reference. NCDOT Mobile is compatible with the iPhone, Android and some newer Blackberry phones.

*** NCDOT ***

NCDOT News Releases
Search Term
Select a Category
Start Date
End Date