NCDOT Awards $4.6 Million Contract to Preserve Bridge on U.S. 421 in Carolina Beach Tuesday, June 05, 2012

RALEIGH — N.C. Department of Transportation Secretary Gene Conti has awarded a $4.6 million contract to American Bridge Co. of Coraopolis, Pa. to preserve the bridge over Snows Cut on U.S. 421 in Carolina Beach. 

 

Work can begin as early as July 1 and is scheduled to be completed within 390 days after the start date. 

 

This bridge will be rehabilitated using a new resurfacing technique called hydro-demolition. During this resurfacing process, the deteriorated concrete on the bridge deck will be removed in part using high-pressured water, and the bridge will be resurfaced using high-strength concrete.

 

Hydro-demolition is more precise than traditional pavement removal with a jackhammer, and it reduces the potential for damage to the bridges.  In addition, hydro-demolition is safer and faster than traditional demolition methods and minimizes the impact to traffic. 

 

In addition to hydro-demolition, the contract also includes painting of structural steel and repairs to substructure concrete.

 

This is one of 30 contracts totaling $109.3 million recently awarded by Conti for highway and bridge projects across North Carolina. NCDOT awarded the contracts to the lowest bidders, as required by state law. The bids received on the projects awarded came in about 3.9 percent, or $4.4 million, below NCDOT estimates.

 

Since Gov. Perdue took office in January of 2009, NCDOT has awarded 631 highway contracts totaling $4.3 billion to ensure that all North Carolinians have access to jobs and educational opportunities.

 

Gov. Bev Perdue’s proposed budget continues to support enhancing or expanding our transportation infrastructure.  In doing so, Gov. Perdue continues to support immediate jobs in the construction sector and the goal of ensuring that our transportation network facilitates access to jobs, education and healthcare for the future.

 

***NCDOT***

NCDOT News Releases
Search Term
Select a Category
Start Date
End Date