Lane Closures on N.C. 55 Bypass in Wake County Next Week Friday, February 10, 2012

RALEIGH — One of two lanes in each direction of the N.C. 55 Bypass in Holly Springs will be closed between Technology Drive and Old Smithfield Road beginning Monday, Feb. 13 through Saturday, Feb. 18, weather permitting.

The closure will take place daily from 9 a.m. until 4 p.m., and is necessary as the contractor for the Western Wake Freeway prepares for future storm drain improvements in the median.

One lane will remain open in each direction at all times.  

For information about the Western Wake Freeway project -- a section of the Triangle Expressway, North Carolina's first modern toll road-- visit www.westernwakeinfo.com.

NCDOT reminds motorists to watch signs for construction information, stay alert and obey the posted speed limit.

For real-time travel information at any time, call 511, visit www.ncdot.gov/travel or follow NCDOT on Twitter. Another option is NCDOT Mobile, a phone-friendly version of the NCDOT website. To access it, type "m.ncdot.gov" into the browser of your smartphone. Then, bookmark it for future reference. NCDOT Mobile is compatible with the iPhone, Android and some newer Blackberry phones.

*** NCDOT ***
NCDOT News Releases
Search Term
Select a Category
Start Date
End Date