Alligator River Bridge on U.S. 64 to Close for Swing-Span Repairs Jan. 10-17 Thursday, December 07, 2017

RALEIGH – The North Carolina Department of Transportation will close the Alligator River Bridge between Tyrrell and Dare counties to all vehicle traffic and boat navigation for one week in January. The closure will be in place from 12:01 a.m. on Wednesday, Jan. 10 through Tuesday, Jan. 16.

It will allow crews to perform major renovation work on the bridge’s swing-span drawbridge. Workers will be repairing and replacing electrical and mechanical components located beneath the swing span.

The work is part of an extensive renovation project designed to extend the life of the 58-year-old bridge. The $16.7 million contract was awarded to Flatiron Constructors of Morrisville, NC back in March 2017.

During the closure, NCDOT will have detour signage and variable message signs in place to guide motorists through the following detour routes:

  • Motorists traveling east from Columbia should use N.C. 94 South to U.S. 264 East to U.S. 64.
  • Motorists traveling west from Dare County to Columbia should use U.S. 264 West to N.C. 94 North to U.S. 64.
  • Motorists traveling to the Outer Banks from areas west of Williamston should use U.S. 17 North to U.S. 158 East.
  • Motorists traveling from the Outer Banks to points west of Williamston should use U.S. 158 West to U.S. 17 South to U.S. 64 West.

The project will require another week-long closure for the bridge in March 2018. The dates for that closure have not been determined at this time.

(NCDOT)

Release Image
Click this image to view at original resolution

(CAPTION: NCDOT detour routes  around the Alligator River Bridge, which will close Jan. 10-17 for renovation work on the bridge's swing-span.)
NCDOT News Releases
Search Term
Select a Category
Start Date
End Date